Projects

Mathillo Thulokhola A Hydropower Project (22.5 MW)

Project Name:

Mathillo Thulokhola A Hydropower Project (22.5 MW)

Contractor :

Dev Urja Construction Pvt. Ltd.

Sub Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Soil Nailing/
Rock Anchor
(Ground Anchor):

Drilling 76mm dia. Inclined hole up to 12m long, inserting 32mm dia. rebar, Grouting through the Hole
Quantity : 9600 Rm.

Weep Hole/Drainage Hole :

Drilling 76mm dia. hole up to 5m long and inserting 50mm perforated HDPE pipe wrap with geotextile.
Quantity : 2400 Rm.

Shotcrete :

100mm thick Wet shotcrete with 4mm*100mm*100mm wire mesh
Quantity : 5400 Sqm.

soil nailing
Status : Running

Dusit Thani Himalayan Resort, Kabhre

Project Name:

Dusit Thani Himalayan Resort

Contractor :

Omstone Asia Capital Nepal Pvt. Ltd.

Sub Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Soil Nailing/
Rock Anchor
(Ground Anchor):

Drilling 100mm dia. Inclined hole up to 15m long, inserting 32mm dia. rebar, Grouting through the Hole
Quantity : 3652 Rm.

Micro Pile :

Drilling 140mm dia. vertical hole up to 12m long, inserting 114mm OD . MS Pipe, inserting 16mm dia. rebar and Grouting .
Quantity : 561 Rm.

Grouting Work :

Cement grouting work with 2 Mpa.
Quantity : 86300 kgs.

soil nailing
Status : Completed

Setikhola Hydropower Project (22 MW)

Project Name:

Setikhola Hydropower Project (22 MW)

Contractor :

: M.A. Construction Pvt. Ltd.

Sub Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Soil Nailing/ Rock Anchor (Ground Anchor):

Drilling 66mm dia. Inclined hole up to 12m long, inserting 32mm dia. rebar and Grouting through the Hole.
Quantity : 7579 Rm.

Vertical Rock Anchor :

Drilling 76mm dia. 4m long vertical hole, inserting 32mm dia. rebar and Grouting through the Hole.
Quantity : 2500 Rm.

Weep Hole :

Drilling 76mm dia. hole up to 5m long and inserting 50mm perforated HDPE pipe wrap with geotextile.
Quantity : 1512 Rm.

soil nailing
Status : Completed

Maibeni Hydroelectric Project, Illam

Project Name:

Maibeni Hydroelectric Project, Illam

Contractor :

Urja Developers Pvt. Ltd.

Sub Contractor :

CE Construction Pvt. Ltd.

Work Description :
Slope Stabilization Work :

Soil Nailing :Drilling 60-90mm dia. Hole up to 18m depth by DTH Machine Inserting rebar, Grouting through the hole with Mechanical Packer with required pressure.
Quantity: 1248 Rm.

soil nailing
Status : Completed

Narayanghat-Mugling Road Project

Project Name:

Slope stabilization work Narayanghat-Mugnin Road Project

Client :

Department of Road

Contractor :

Bajraguru/Rayamajhi JV

Sub Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Micro Piling :

Drilling by DTH 10m depth, inserting 90mm dia. MS pipe pressure grouting of cement water ratio (1:1) around the inserted pipe in Landslide stabilization work.
Quantity : 880 Rm.

soil nailing
Status : Completed

Dumre Beshisahar Road

Name:

Road Side Slope Disaster Management of Udipur Landslide atCh: 32+700
(Dumre-Besisahar-Chame Road)

Client :

Department of Road

Contractor :

Fewa ConstructionPvt. Ltd.

Sub Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Micro Piling :

Drilling by Truck Mounted DTH 4m depth, inserting 114mm dia. GI pipe, at Bhotekoshi River Bank.
Quantity : ??? Rm.

Weep Hole

Drilling 114mm dia. hole up to 18m long and inserting 76mm perforated HDPE pipe wrap with geotextile.
Quantity : ??? Rm.

soil nailing
Status : Completed

Shree Madhyamik Bidhyalaya, Fikkal-02, Lumti, Sindhuli

Project Name:

MORD-3550-S9071-3-OPT 3 Shree Secondary School Lumti Sindhuli SS

Client :

USAID, Nepal

Prime Contractor :

MVL, Dubai

Contractor :

Baniya Nirman Sewa Pvt. Ltd.

Sub Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Slope Stabilization :

Drilling a 115mm dia. Hole up to 15m depth by DTH Machine, inserting 90mm dia. MS pipe, Inserting TMT Bar, Grouting through the hole with Mechanical Packer with required pressure, Perforation of MS Pipe, erection and dismantle of scaffolding, site clearance, preparation of ground surface, laying & fixing of geogrid.
Quantity : 3844 Rm.

soil nailing
Status : Running

Landfield Site Bancharedanda

Project Name:

Water Retaining Reinforced Soil Structure Construction Work at Bancharedada Sanitary Landfill Site, Nuwakot-Dhading

Client :

Government of Nepal, Urban Development Ministry, Singhadurbar, Kathmandu

Contractor :

Kalika Construction Pvt. Ltd.

Sub Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Drilling holes for
Grouting & Cement Grouting Work :

'Drilling & Grouting works (7m, & 10m depth) Drilling by Tractor Mounted DTH Machine and Mountain Drill DTH Machine inserting 38mm dia. perforated HDPE pipe to depth of 7m, & 10m. Inside holes with pressure grouting of cement water ratio (1.35:1).
Quantity : 744 Rm Drilling & 2000 Bags Cement Grout.

soil nailing
Status : Running

Thankot Warehouse Project, Thankot, Kathmandu

Project Name:

Thankot Warehouse Project, Thankot, Kathmandu

Contractor :

Asian Infrastructure Pvt. Ltd.

Sub Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Micro Piling :

Drilling a 140mm dia.hole by DTH 12m depth, inserting 114mm dia. MS pipe pressure grouting of cement water ratio (1:1) around the inserted pipe in Landslide stabilization work.
Quantity : 1336 Rm.

soil nailing
Status : Completed

Tower Protection Work at Thapatar, Phidim

Project Name:

Tower Protection Works At Thapatar, Panchthar (Tower No. 125, Godak-Thapatar
132 KV Transmission Line Section), II PHASE

Client :

Nepal Electricity Authority

Contractor :

Aashika Construction And Sarsaphai Pvt. Ltd.

Sub Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Soil Nailing (Ground Anchor):

Drilling 76mm dia. Inclined hole up to 7m long, Inserting 25mm dia. rebar, Grouting through the Hole.
Quantity : 886 Rm.

soil nailing
Status : Completed

Slope and Tower Protection Works of Khimti-Dhalkebar

Project Name:

Slope and Tower Protection Works of Tower No. 15 of Khimti-Dhalkebar 220kV Transmission Line

Contractor :

Venus Construction & Water proofing Pvt. Ltd.

Sub Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Soil Nailing (Ground Anchor):

Drilling 76mm dia. Inclined hole up to 10m long, inserting 25mm dia. rebar, Grouting through the Hole.
Quantity : 806 Rm.

soil nailing
Status : Completed

Super Kabeli A Hydropower Project 13.5 MW

Project Name:

Super Kabeli A Hydropower Project 13.5 MW

Contractor :

Bhugol Construction Pvt. Ltd.

Sub Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Soil Nailing (Ground Anchor):

Drilling 76mm dia. Inclined hole 8m long, inserting 25mm dia. rebar, Grouting through the Hole.
Quantity : 1500 Rm.

soil nailing
Status : Completed

Summit Hotel, Bakhundol Lalitpur

Project Name:

Summit Hotel & Residence

Contractor :

Sharma & Company Pvt. Ltd.

Sub Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Soil Nailing (Ground Anchor):

Micro Piling : Drilling a 140mm dia.hole by DTH 12m depth, inserting 114mm dia. MS pipe pressure grouting of cement water ratio (1:1) around the inserted pipe in Landslide stabilization work.
Quantity : 774 Rm.

soil nailing
Status : Completed

Summit Hotel, Bakhundol Lalitpur

Project Name:

Summit Hotel & Residence

Contractor :

Geotech Drilling & Construction Pvt. Ltd.

Work Description :
Soil Nailing (Ground Anchor):

Micro Piling : Drilling a 140mm dia.hole by DTH 12m depth, inserting 114mm dia. MS pipe pressure grouting of cement water ratio (1:1) around the inserted pipe in Landslide stabilization work.
Quantity : 867 Rm.

soil nailing
Status : Completed