Project Name:
Mathillo Thulokhola A Hydropower Project (22.5 MW)
Contractor :
Dev Urja Construction Pvt. Ltd.
Sub Contractor :
Geotech Drilling & Construction Pvt. Ltd.
Drilling 76mm dia. Inclined hole up to 12m long, inserting 32mm dia. rebar, Grouting
through
the
Hole
Quantity : 9600 Rm.
Drilling 76mm dia. hole up to 5m long and inserting 50mm perforated HDPE pipe wrap with
geotextile.
Quantity : 2400 Rm.
100mm thick Wet shotcrete with 4mm*100mm*100mm wire mesh
Quantity : 5400 Sqm.
Project Name:
Dusit Thani Himalayan Resort
Contractor :
Omstone Asia Capital Nepal Pvt. Ltd.
Sub Contractor :
Geotech Drilling & Construction Pvt. Ltd.
Drilling 100mm dia. Inclined hole up to 15m long, inserting 32mm dia. rebar, Grouting
through
the Hole
Quantity : 3652 Rm.
Drilling 140mm dia. vertical hole up to 12m long, inserting 114mm OD . MS Pipe, inserting
16mm dia. rebar and Grouting .
Quantity : 561 Rm.
Cement grouting work with 2 Mpa.
Quantity : 86300 kgs.
Project Name:
Setikhola Hydropower Project (22 MW)
Contractor :
: M.A. Construction Pvt. Ltd.
Sub Contractor :
Geotech Drilling & Construction Pvt. Ltd.
Drilling 66mm dia. Inclined hole up to 12m long, inserting 32mm dia. rebar and Grouting
through the Hole.
Quantity : 7579 Rm.
Drilling 76mm dia. 4m long vertical hole, inserting 32mm dia. rebar and Grouting through
the Hole.
Quantity : 2500 Rm.
Drilling 76mm dia. hole up to 5m long and inserting 50mm perforated HDPE pipe wrap with
geotextile.
Quantity : 1512 Rm.
Project Name:
Maibeni Hydroelectric Project, Illam
Contractor :
Urja Developers Pvt. Ltd.
Sub Contractor :
CE Construction Pvt. Ltd.
Soil Nailing :Drilling 60-90mm dia. Hole up to 18m depth by DTH Machine Inserting
rebar, Grouting through the hole with Mechanical Packer with required
pressure.
Quantity: 1248 Rm.
Project Name:
Slope stabilization work Narayanghat-Mugnin Road Project
Client :
Department of Road
Contractor :
Bajraguru/Rayamajhi JV
Sub Contractor :
Geotech Drilling & Construction Pvt. Ltd.
Drilling by DTH 10m depth, inserting 90mm dia. MS pipe pressure grouting of
cement water ratio (1:1) around the inserted pipe in Landslide stabilization
work.
Quantity : 880 Rm.
Name:
Road Side Slope Disaster Management of
Udipur Landslide atCh: 32+700
(Dumre-Besisahar-Chame Road)
Client :
Department of Road
Contractor :
Fewa ConstructionPvt. Ltd.
Sub Contractor :
Geotech Drilling & Construction Pvt. Ltd.
Drilling by Truck Mounted DTH 4m depth, inserting 114mm dia. GI pipe, at
Bhotekoshi River Bank.
Quantity : ??? Rm.
Drilling 114mm dia. hole up to 18m long and inserting 76mm perforated HDPE
pipe wrap with geotextile.
Quantity : ??? Rm.
Project Name:
MORD-3550-S9071-3-OPT 3 Shree Secondary School Lumti Sindhuli SS
Client :
USAID, Nepal
Prime Contractor :
MVL, Dubai
Contractor :
Baniya Nirman Sewa Pvt. Ltd.
Sub Contractor :
Geotech Drilling & Construction Pvt. Ltd.
Drilling a 115mm dia. Hole up to 15m depth by DTH
Machine, inserting 90mm dia. MS pipe, Inserting TMT Bar, Grouting
through the hole with Mechanical Packer with required pressure,
Perforation of MS Pipe, erection and dismantle of scaffolding, site
clearance, preparation of ground surface, laying & fixing of geogrid.
Quantity : 3844
Rm.
Project Name:
Water Retaining Reinforced Soil Structure Construction Work at Bancharedada Sanitary Landfill Site, Nuwakot-Dhading
Client :
Government of Nepal, Urban Development Ministry, Singhadurbar, Kathmandu
Contractor :
Kalika Construction Pvt. Ltd.
Sub Contractor :
Geotech Drilling & Construction Pvt. Ltd.
'Drilling &
Grouting works (7m, & 10m depth) Drilling by Tractor Mounted DTH
Machine and Mountain Drill DTH Machine inserting 38mm dia.
perforated HDPE pipe to depth of 7m, & 10m. Inside holes with
pressure grouting of cement water ratio (1.35:1).
Quantity : 744 Rm Drilling & 2000
Bags
Cement Grout.
Project Name:
Thankot Warehouse Project, Thankot, Kathmandu
Contractor :
Asian Infrastructure Pvt. Ltd.
Sub Contractor :
Geotech Drilling & Construction Pvt. Ltd.
Drilling a 140mm dia.hole by DTH 12m depth, inserting 114mm dia. MS pipe
pressure grouting of cement water ratio (1:1) around the inserted pipe in Landslide
stabilization work.
Quantity : 1336 Rm.
Project Name:
Tower Protection Works At Thapatar, Panchthar (Tower No.
125,
Godak-Thapatar
132 KV Transmission Line Section), II PHASE
Client :
Nepal Electricity Authority
Contractor :
Aashika Construction And Sarsaphai Pvt. Ltd.
Sub Contractor :
Geotech Drilling & Construction Pvt. Ltd.
Drilling 76mm dia. Inclined hole up to 7m long, Inserting
25mm dia. rebar, Grouting through the Hole.
Quantity : 886 Rm.
Project Name:
Slope and Tower Protection Works of Tower No. 15 of Khimti-Dhalkebar 220kV Transmission Line
Contractor :
Venus Construction & Water proofing Pvt. Ltd.
Sub Contractor :
Geotech Drilling & Construction Pvt. Ltd.
Drilling 76mm dia. Inclined hole up to 10m long,
inserting 25mm dia. rebar, Grouting through the Hole.
Quantity : 806 Rm.
Project Name:
Super Kabeli A Hydropower Project 13.5 MW
Contractor :
Bhugol Construction Pvt. Ltd.
Sub Contractor :
Geotech Drilling & Construction Pvt. Ltd.
Drilling 76mm dia. Inclined hole 8m long, inserting 25mm dia. rebar, Grouting through
the Hole.
Quantity : 1500 Rm.
Project Name:
Summit Hotel & Residence
Contractor :
Sharma & Company Pvt. Ltd.
Sub Contractor :
Geotech Drilling & Construction Pvt. Ltd.
Micro Piling : Drilling a 140mm dia.hole by DTH 12m depth, inserting 114mm dia. MS pipe
pressure grouting of cement water ratio (1:1) around the inserted pipe in Landslide
stabilization work.
Quantity : 774 Rm.
Project Name:
Summit Hotel & Residence
Contractor :
Geotech Drilling & Construction Pvt. Ltd.
Micro Piling : Drilling a 140mm dia.hole by DTH 12m depth, inserting 114mm dia. MS pipe
pressure grouting of cement water ratio (1:1) around the inserted pipe in Landslide
stabilization work.
Quantity : 867 Rm.